SPECIFICATION & CONSTRUCTION STANDARDS

Bridge Specifications
Stemwalls & Wingwalls
Bottom Slab & Footings
Deck Slab

 Drain Crossing Installation

Bridge Specifications

A

STEMWALLS & WINGWALLS

SPAN

CONCRETE THICKNESS

STEEL
SIZE & SPACING

4’ to 5’

8" THICK

3,000 P.S.I.

#4 BAR 12" C.C.

SINGLE CURTAIN

6’ to 7’

8" THICK

3,000 P.S.I.

#4 BAR 12" C.C.

SINGLE CURTAIN

8’ to 9’

8" THICK

3,000 P.S.I.

#4 BAR 12" C.C.

SINGLE CURTAIN

10’ to 11’

8" THICK

3,000 P.S.I.

#4 BAR 12" C.C.

DOUBLE CURTAIN

12’ to 13’

8" THICK

3,000 P.S.I.

#4 BAR 12" C.C.

DOUBLE CURTAIN

Back to Top

B

BOTTOM SLAB & FOOTINGS

SPAN

CONCRETE THICKNESS

STEEL
SIZE & SPACING

4’ to 5’

8" THICK SLAB

10" x 24" FOOTING

#4 BAR 12" C.C.

SINGLE MAT

6’ to 7’

8" THICK SLAB

10" x 24" FOOTING

#4 BAR 12" C.C.

SINGLE MAT

8’ to 9’

8" THICK SLAB

10" x 24" FOOTING

#4 BAR 8" C.C.

SINGLE MAT

10’ to 11’

8" THICK SLAB

12" x 24" FOOTING

# BAR 6" C.C.

SINGLE MAT

12’ to 13’

8" THICK SLAB

12" x 24" FOOTING

#5 BAR 6" C.C.

SINGLE MAT

Back to Top

C

DECK SLAB

SPAN

"T"

TOP MAT STEEL

BOTTOM MAT STEEL

4’ to 5’

8"

#4 BAR 18" C.C.

#5 BAR

12" I.D.O.T. 12" O.D.O.T.

6’ to 7’

8"

#4 BAR 18" C.C.

#5 BAR

11" I.D.O.T. 12" O.D.O.T.

8’ to 9’

8"

#4 BAR 18" C.C.

#5 BAR

9" I.D.O.T. 11" O.D.O.T.

10’ to 11’

10"

#4 BAR 18" C.C.

#6 BAR

7" I.D.O.T. 9" O.D.O.T.

12’ to 13’

10"

#4 BAR 12" C.C.

#6 BAR

4" I.D.O.T. 6" O.D.O.T.

I.D.O.T. = DIRECTION OF TRAFFIC

O.D.O.T. = OPPOSITE DIRECTION OF TRAFFIC

SINGLE CURTAIN & MAT – CENTER IN CONCRETE

DOUBLE CURTAIN & MAT – CENTER 2" FROM EXTERIOR SURFACES

Back to Top

Drain Crossing Installation

DIMENSION OF CROSS SECTION VIEW:

PIPE SPECIFICATIONS:

  1. 12 gauge asphalt coated pipe
  2. ADS polyethylene pipe

FORMULA:

  1. L = 2 (HX2) + A
  2. A = ROAD WIDTH AS SPECIFIED BY CITY, COUNTY AND OTHER ORDINANCES
  3. D = DIAMETER OF PIPE AS SPECIFIED BY T.C.I.D.
  4. Z = FILL SLOPE AS SPECIFIED BY T.C.I.D. SLOPE WILL BE 2:1
  5. H = DEPTH OF FILL AS SPECIFIED BY PROPOSED SITE NEEDS
  6. RIP RAP WILL BE 3" +
  7. COMPACTION 95%

Back to Top

 

Home Page Our Purpose History of TCID Water Rights
Operations Criteria and Procedures Operations Criteria and Procedures Targets Recoupment Explained What are Easements?
O&M Contract Management Policies Management Policies Board of Directors
Board of Directors Committees Management & Staff
Ditchriders
Lahontan Storage Levels
Fee Schedule
Water Orders
Related Links
Surplus Equipment Listings
Forms
Photo Gallery
Local Weather Forcasts
Water Facts
Contact Us!

2000-2010 Truckee-Carson Irrigation District. All rights reserved.
Site Design and Updates: (Michael Adams).
Questions? Comments? Write to our Webmaster.